Residential — In Construction

Residence 02

A ground-up custom single-family residence in North Carolina: SIP structure over a precast foundation, a well-built envelope, and an integrated energy system with on-site solar and battery storage.

Residence 02 — entry view, North Carolina

Project Info

Type
Residential
Program
Single-Family
Location
North Carolina
Status
In Construction
Structure
SIP panels, precast foundation
Systems
Solar carport, battery storage, ERV
Services
Schematic Design, Construction Documents, Interiors & Specs

Prefab over code minimum

This project tested what it takes to build better. The structural system is SIPs over a precast foundation, both delegated systems that force decisions earlier than conventional framing. The envelope has continuous insulation, details that are mostly free of thermal bridges, better airtightness than most stick-builds, and energy-efficient windows. It isn’t Passive House, but it was designed from the same perspective.

Early energy modeling clearly showed the gap between this envelope and a code-minimum build. The added cost is smaller than most people expect. The harder part is aligning subcontractors and sizing the mechanical system for the tighter envelope. The payoffs are lower operating costs, better comfort, and durability that a simple ROI calculation doesn’t capture.

Residence 02 — solar carport and PV array

Site and energy design

The client wanted to generate and store their own power. The carport is a proper structure with a south-facing roof plane sized for a full PV array. The panels feed an on-site battery system, so the house keeps power through outages and draws less from the grid.

The house and carport share a structure, roofline, and material palette, so they read as part of the landscape.

Residence 02 — south elevation from wooded area

Systems coordination

SIP and precast foundation construction compresses the schedule and eliminates a category of site labor, but it demands that the mechanical, electrical, and plumbing be fully coordinated before panels arrive. You can’t cut into SIPs after the fact without cost and consequence. We resolved mechanical and ERV distribution, electrical routing, and battery room sizing up front, so the field crew had a complete set of documents from day one.